Projects

Projects

13.5M SHALLOW DRAFT RIVER TUG

Chris Mulder supervised the production of a detailed design package, including a comprehensive technical specification, for the construction of a small tugboat for Manitoba Hydro.

M/V DALLAS‐FAYE Refit Plan

Chris Mulder conducted a condition survey of Manitoba Hydro’s self‐propelled, trailerable work barge in order to assess the extent of work required to attain a further 25 years of service life from the vessel.

AURORA EXPLORER - Refit Support

Mark Mulligan acted as Project Manager for the complete engine room structural revision to re‐align main engines and gearboxes to incorporate a pod system.

Pages

Portfolio

Latest News

News

Barges: It Takes All Kinds

The runner is being offloaded near Valemont and trucked to the Mica Dam.

KINBASKET LAKE - In July 2013 an 83-year-old barge of riveted steel construct

New inland ferry makes a splash

NAKUSP - Travellers crossing Upper Arrow Lake are one step closer to having a

Capilano Maritime Design presents LNG Ro-Ro at CFOA

Design: Capilano Maritime Design; Rendering Credit: Coda Marine Design

VICTORIA - At the Canadian Ferry Operators Association Conference Sept.

Pages