Error message

Notice: Undefined variable: url in eval() (line 2 of /home1/capilano/public_html/modules/php/php.module(74) : eval()'d code).

Projects

13.5M SHALLOW DRAFT RIVER TUG

Chris Mulder supervised the production of a detailed design package, including a comprehensive technical specification, for the construction of a small tugboat for Manitoba Hydro.

M/V DALLAS‐FAYE Refit Plan

Chris Mulder conducted a condition survey of Manitoba Hydro’s self‐propelled, trailerable work barge in order to assess the extent of work required to attain a further 25 years of service life from the vessel.

AURORA EXPLORER - Refit Support

Mark Mulligan acted as Project Manager for the complete engine room structural revision to re‐align main engines and gearboxes to incorporate a pod system.

Pages