Chris Mulder supervised the production of a detailed design package, including a comprehensive technical specification, for the construction of a small tugboat for Manitoba Hydro.
Chris Mulder conducted a condition survey of Manitoba Hydro’s self‐propelled, trailerable work barge in order to assess the extent of work required to attain a further 25 years of service life from the vessel.
Mark Mulligan acted as Project Manager for the complete engine room structural revision to re‐align main engines and gearboxes to incorporate a pod system.